March 2014 - Completed annual calibration of combustible has indicators (CGIs) at eight locations.
March 2014 - Pumped out condensate tank for transport and disposal off-site.
July 2014 - Installed CGI at 440 Bank Ave and replace damaged has extraction valve box (EW-14S) caused by ODOT contractor.
August 2014 - Installed new monitoring probe (MP-17) behind Bank Avenue.
November 2014 - Repaired phone line connection for condensate tank high level alarm.