2020 Landfill Maintenance Activities
January-June 2020 – Performed monthly system check to confirm blower was operational (system was shut off for the Blower Shutdown Test from July through December).
May 2020 – Annual calibration of Combustible Gas Indicators was performed on properties where access was granted by the owner.